
Installation is in progress at Hilton Docker.
The project includes three ATEX Zincowall extraction walls connected to an Aircompact dust collector for sanding and grinding fibreglass.
It also includes two Eurodry 4NA gelcoat booths with air compensation from an air handling unit with a plate heat exchanger and gas burner, plus a wood extraction system serving ten machines.
